top of page

McDonalds

Birkenhead, Northshore

A team of electricians and HVAC technicians undertook a full mechanical install of this brand new McDonalds.

 

Two new package units serving the main lobby and kitchen were installed on the roof, and new kitchen and toilet extract system. We upgraded the standard Temperzone controller to new Regin DDC controls including CO2 monitoring, free cooling with fresh air modulation. An LCD HMI (Human machine interface) was installed for the customer to be able to monitor performance of package units as well as making adjustments at the touch of a finger.

 

Our team performed all the E4M wiring system for this project as well as installing the cool room and freezer.

 

BCS are performing continuous commissioning on this project to achieve maximum energy performance. 